Penrith 02

Description

ALJ has been appointed by the developer to investigate a building under construction with suspected defected core walls (preformed wall type). Three floors found with substantial structural defects where large portions found hollow with no concrete inside the preformed walls in addition to no sufficient concrete cover.

ALJ provided structural strengthening and repair design.

Project Details