Liverpool

Description

 A building has been set out wrongly and encroaches High Voltage cable lines safe zone.

ALJ proposed cutting 2.5m depth from the building façade to comply with the required safe zone instead of knocking down 6-floors construction. That involved demolishing the facade columns and introduce a new line of transferred columns and transfer elements at the L01 slab. ALJ worked closely with the builder, the architect, and the original structural engineer to ensure an effective solution with minimum impact on the architecture intention and structure system. 